SLAB THICKNESS 18 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 4133 kg

The Dynamic load for:

50 repetitions/day: 3848 kg

100 repetitions/day: 3563 kg

200 repetitions/day: 3183 kg

300 repetitions/day: 2945 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4m – 5m

Outdoor slab: 3,5m – 4m

Depth of cut joint: 6 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 4350 kg

The Dynamic load for:

50 repetitions/day: 4050 kg

100 repetitions/day: 3750 kg

200 repetitions/day: 3350 kg

300 repetitions/day: 3100 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4m – 5m

Outdoor slab: 3,5m – 4m

Depth of cut joint: 6 cm