SLAB THICKNESS 19 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 4275 kg

The Dynamic load for:

50 repetitions/day: 4275 kg

100 repetitions/day: 3943 kg

200 repetitions/day: 3515 kg

300 repetitions/day: 3278 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,25m – 5,5m

Outdoor slab: 4m – 5m

Depth of cut joint: 6 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 4500 kg

The Dynamic load for:

50 repetitions/day: 4500 kg

100 repetitions/day: 4150 kg

200 repetitions/day: 3700 kg

300 repetitions/day: 3450 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,25m – 5,5m

Outdoor slab: 4m – 5m

Depth of cut joint: 6 cm