SLAB THICKNESS 17 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 3610 kg
The Dynamic load for:
50 repetitions/day: 3515 kg
100 repetitions/day: 3230 kg
200 repetitions/day: 2898 kg
300 repetitions/day: 2660 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m – 5m
Outdoor slab: 3,5m – 4m
Depth of cut joint: 5,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 3800 kg
The Dynamic load for:
50 repetitions/day: 3700 kg
100 repetitions/day: 3400 kg
200 repetitions/day: 3050 kg
300 repetitions/day: 2800 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m – 5m
Outdoor slab: 3,5m – 4m
Depth of cut joint: 5,5 cm