SLAB THICKNESS 22 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 7400 kg

The Dynamic load for:

50 repetitions/day: 5700 kg

100 repetitions/day: 5260 kg

200 repetitions/day: 4710 kg

300 repetitions/day: 4360 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,5m - 6m

Outdoor slab: 4,5m - 6m

Depth of cut joint: 7 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 7700 kg

The Dynamic load for:

50 repetitions/day: 5950  kg

100 repetitions/day: 5005  kg

200 repetitions/day: 4940 kg

300 repetitions/day: 4565 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,5m - 6m

Outdoor slab: 4,5m - 6m

Depth of cut joint: 7 cm

https://fibratec.grphost.com/wp-content/themes/skudo/
https://fibratec.grphost.com//
#43b8de
style1
paged
Loading posts...
#
on
none
#
Sort Gallery
on
yes
yes
off