SLAB THICKNESS 20 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 6300 kg

The Dynamic load for:

50 repetitions/day: 4800 kg

100 repetitions/day: 4440 kg

200 repetitions/day: 3975 kg

300 repetitions/day: 3680 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,25m - 5,5m

Outdoor slab: 4m - 5m

Depth of cut joint: 6,5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 6500  kg

The Dynamic load for:

50 repetitions/day: 5035 kg

100 repetitions/day: 4658 kg

200 repetitions/day: 4160 kg

300 repetitions/day: 3840 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,25m - 5,5m

Outdoor slab: 4m - 5m

Depth of cut joint: 6,5 cm

https://fibratec.grphost.com/wp-content/themes/skudo/
https://fibratec.grphost.com//
#43b8de
style1
paged
Loading posts...
#
on
none
#
Sort Gallery
on
yes
yes
off