SLAB THICKNESS 16 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 4180 kg

The Dynamic load for:

50 repetitions/day: 3705 kg

100 repetitions/day: 3420 kg

200 repetitions/day: 3040 kg

300 repetitions/day: 2850 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 4400 kg

The Dynamic load for:

50 repetitions/day: 3900 kg

100 repetitions/day: 3600 kg

200 repetitions/day: 3200 kg

300 repetitions/day: 3000 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm

https://fibratec.grphost.com/wp-content/themes/skudo/
https://fibratec.grphost.com//
#43b8de
style1
paged
Loading posts...
#
on
none
#
Sort Gallery
on
yes
yes
off