SLAB THICKNESS 15 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 3800 kg

The Dynamic load for:

50 repetitions/day: 3325 kg

100 repetitions/day: 3040 kg

200 repetitions/day: 2755 kg

300 repetitions/day: 2518 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 4000 kg

The Dynamic load for:

50 repetitions/day: 3500 kg

100 repetitions/day: 3200 kg

200 repetitions/day: 2900 kg

300 repetitions/day: 2650 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm