SLAB THICKNESS 12 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 2708 kg

The Dynamic load for:

50 repetitions/day: 2233 kg

100 repetitions/day: 2090 kg

200 repetitions/day: 1853 kg

300 repetitions/day: 1710 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3m - 3,5m

Outdoor slab: 2m - 3m

Depth of cut joint: 4 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 2850 kg

The Dynamic load for:

50 repetitions/day: 2350 kg

100 repetitions/day: 2200 kg

200 repetitions/day: 1950 kg

300 repetitions/day: 1800 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3m - 3,5m

Outdoor slab: 2m - 3m

Depth of cut joint: 4 cm