SLAB THICKNESS 20 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 5510 kg
The Dynamic load for:
50 repetitions/day: 5463 kg
100 repetitions/day: 5035 kg
200 repetitions/day: 4513 kg
300 repetitions/day: 4180 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 5800 kg
The Dynamic load for:
50 repetitions/day: 5750 kg
100 repetitions/day: 5300 kg
200 repetitions/day: 4750 kg
300 repetitions/day: 4400 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6,5 cm