SLAB THICKNESS 16 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 3895 kg
The Dynamic load for:
50 repetitions/day: 3705 kg
100 repetitions/day: 3420 kg
200 repetitions/day: 3040 kg
300 repetitions/day: 2850 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,75m- 4,5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 4100 kg
The Dynamic load for:
50 repetitions/day: 3900 kg
100 repetitions/day: 3600 kg
200 repetitions/day: 3200 kg
300 repetitions/day: 3000 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,75m- 4,5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5 cm