SLAB THICKNESS 22 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 9595 kg
The Dynamic load for:
50 repetitions/day: 7885 kg
100 repetitions/day: 7268 kg
200 repetitions/day: 6508 kg
300 repetitions/day: 6033 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,5m - 6m
Outdoor slab: 4,5m - 6m
Depth of cut joint: 7 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 10100 kg
The Dynamic load for:
50 repetitions/day: 8300 kg
100 repetitions/day: 7650 kg
200 repetitions/day: 6850 kg
300 repetitions/day: 6350 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,5m - 6m
Outdoor slab: 4,5m - 6m
Depth of cut joint: 7 cm