SLAB THICKNESS 19 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 7600 kg
The Dynamic load for:
50 repetitions/day: 6175 kg
100 repetitions/day: 5700 kg
200 repetitions/day: 5130 kg
300 repetitions/day: 4750 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 8000 kg
The Dynamic load for:
50 repetitions/day: 6500 kg
100 repetitions/day: 6000 kg
200 repetitions/day: 5400 kg
300 repetitions/day: 5000 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6 cm