SLAB THICKNESS 14 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 4845 kg

The Dynamic load for:

50 repetitions/day: 3800 kg

100 repetitions/day: 3515 kg

200 repetitions/day: 3135 kg

300 repetitions/day: 2898 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,5m - 4m

Outdoor slab: 2,5m - 3,5m

Depth of cut joint: 4,5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 5100 kg

The Dynamic load for:

50 repetitions/day: 4000 kg

100 repetitions/day: 3700 kg

200 repetitions/day: 3300 kg

300 repetitions/day: 3050 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,5m - 4m

Outdoor slab: 2,5m - 3,5m

Depth of cut joint: 4,5 cm