SLAB THICKNESS 12 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 3990 kg
The Dynamic load for:
50 repetitions/day: 2993 kg
100 repetitions/day: 2755 kg
200 repetitions/day: 2470 kg
300 repetitions/day: 2280 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 4200 kg
The Dynamic load for:
50 repetitions/day: 3150 kg
100 repetitions/day: 2900 kg
200 repetitions/day: 2600 kg
300 repetitions/day: 2400 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm