SLAB THICKNESS 21 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 9880 kg
The Dynamic load for:
50 repetitions/day: 7933 kg
100 repetitions/day: 7315 kg
200 repetitions/day: 6555 kg
300 repetitions/day: 6080 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,5m - 6m
Outdoor slab: 4m - 5m
Depth of cut joint: 7 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 10400 kg
The Dynamic load for:
50 repetitions/day: 8350 kg
100 repetitions/day: 7700 kg
200 repetitions/day: 6900 kg
300 repetitions/day: 6400 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,5m - 6m
Outdoor slab: 4m - 5m
Depth of cut joint: 7 cm