SLAB THICKNESS 19 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 8550 kg
The Dynamic load for:
50 repetitions/day: 6745 kg
100 repetitions/day: 6223 kg
200 repetitions/day: 5558 kg
300 repetitions/day: 5178 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 9000 kg
The Dynamic load for:
50 repetitions/day: 7100 kg
100 repetitions/day: 6550 kg
200 repetitions/day: 5850 kg
300 repetitions/day: 5450 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,25m - 5,5m
Outdoor slab: 4m - 5m
Depth of cut joint: 6 cm