SLAB THICKNESS 14 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 5700 kg
The Dynamic load for:
50 repetitions/day: 4228 kg
100 repetitions/day: 3943 kg
200 repetitions/day: 3515 kg
300 repetitions/day: 3230 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,5m - 4m
Outdoor slab: 2,5m - 3,5m
Depth of cut joint: 4,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 6000 kg
The Dynamic load for:
50 repetitions/day: 4450 kg
100 repetitions/day: 4150 kg
200 repetitions/day: 3700 kg
300 repetitions/day: 3400 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,5m - 4m
Outdoor slab: 2,5m - 3,5m
Depth of cut joint: 4,5 cm