SLAB THICKNESS 12 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 4750 kg
The Dynamic load for:
50 repetitions/day: 3373 kg
100 repetitions/day: 3088 kg
200 repetitions/day: 2803 kg
300 repetitions/day: 2565 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 5000 kg
The Dynamic load for:
50 repetitions/day: 3550 kg
100 repetitions/day: 3250 kg
200 repetitions/day: 2950 kg
300 repetitions/day: 2700 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm