SLAB THICKNESS 21 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 9880 kg

The Dynamic load for:

50 repetitions/day: 6400 kg
100 repetitions/day: 5900 kg
200 repetitions/day: 5300 kg
300 repetitions/day: 4900 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,5m - 6m

Outdoor slab: 4m - 5m

Depth of cut joint: 7 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 10400 kg

The Dynamic load for:

50 repetitions/day: 6700 kg
100 repetitions/day: 6200 kg
200 repetitions/day: 5555 kg
300 repetitions/day: 5150 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,5m - 6m

Outdoor slab: 4m - 5m

Depth of cut joint: 7 cm