SLAB THICKNESS 17 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 7315 kg
The Dynamic load for:
50 repetitions/day: 5700 kg
100 repetitions/day: 5225 kg
200 repetitions/day: 4703 kg
300 repetitions/day: 4370 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m - 5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 7700 kg
The Dynamic load for:
50 repetitions/day: 6000 kg
100 repetitions/day: 5500 kg
200 repetitions/day: 4950 kg
300 repetitions/day: 4600 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m - 5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5,5 cm