SLAB THICKNESS 15 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 6175 kg
The Dynamic load for:
50 repetitions/day: 4655 kg
100 repetitions/day: 4323 kg
200 repetitions/day: 3848 kg
300 repetitions/day: 3563 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,75m- 4,5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 6500 kg
The Dynamic load for:
50 repetitions/day: 4900 kg
100 repetitions/day: 4550 kg
200 repetitions/day: 4050 kg
300 repetitions/day: 3750 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3,75m- 4,5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5 cm