SLAB THICKNESS 14 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 5700 kg

The Dynamic load for:

50 repetitions/day: 4228 kg

100 repetitions/day: 3943 kg

200 repetitions/day: 3515 kg

300 repetitions/day: 3230 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,5m - 4m

Outdoor slab: 2,5m - 3,5m

Depth of cut joint: 4,5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 6000 kg

The Dynamic load for:

50 repetitions/day: 4450 kg

100 repetitions/day: 4150 kg

200 repetitions/day: 3700 kg

300 repetitions/day: 3400 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,5m - 4m

Outdoor slab: 2,5m - 3,5m

Depth of cut joint: 4,5 cm

https://fibratec.grphost.com/wp-content/themes/skudo/
https://fibratec.grphost.com//
#43b8de
style1
paged
Loading posts...
#
on
none
#
Sort Gallery
on
yes
yes
off