SLAB THICKNESS 13 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 5178 kg
The Dynamic load for:
50 repetitions/day: 3753 kg
100 repetitions/day: 3515 kg
200 repetitions/day: 3135 kg
300 repetitions/day: 2898 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 5450 kg
The Dynamic load for:
50 repetitions/day: 3950 kg
100 repetitions/day: 3700 kg
200 repetitions/day: 3300 kg
300 repetitions/day: 3050 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm