SLAB THICKNESS 24 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 7315 kg

The Dynamic load for:

50 repetitions/day: 6840 kg

100 repetitions/day: 6460 kg

200 repetitions/day: 5795 kg

300 repetitions/day: 5368 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,75m - 6,5m

Outdoor slab: 4,5m - 6m

Depth of cut joint: 8 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 7700 kg

The Dynamic load for:

50 repetitions/day: 7200 kg

100 repetitions/day: 6800 kg

200 repetitions/day: 6100 kg

300 repetitions/day: 5650 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 4,75m - 6,5m

Outdoor slab: 4,5m - 6m

Depth of cut joint: 8 cm