SLAB THICKNESS 23 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 6745 kg
The Dynamic load for:
50 repetitions/day: 6365 kg
100 repetitions/day: 5985 kg
200 repetitions/day: 5368 kg
300 repetitions/day: 4988 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,75m - 6,5m
Outdoor slab: 4,5m - 6m
Depth of cut joint: 7,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 7100 kg
The Dynamic load for:
50 repetitions/day: 6700 kg
100 repetitions/day: 6300 kg
200 repetitions/day: 5650 kg
300 repetitions/day: 5250 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4,75m - 6,5m
Outdoor slab: 4,5m - 6m
Depth of cut joint: 7,5 cm