SLAB THICKNESS 17 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 4180 kg
The Dynamic load for:
50 repetitions/day: 3753 kg
100 repetitions/day: 3468 kg
200 repetitions/day: 3088 kg
300 repetitions/day: 2898 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m - 5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5,5 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 4400 kg
The Dynamic load for:
50 repetitions/day: 3950 kg
100 repetitions/day: 3650 kg
200 repetitions/day: 3250 kg
300 repetitions/day: 3050 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 4m - 5m
Outdoor slab: 3,5m - 4m
Depth of cut joint: 5,5 cm