SLAB THICKNESS 15 CM

DOSAGE FIBRATEC V12-AM: 2 kg / m³

The máximum permisible static point load is 3420 kg

The Dynamic load for:

50 repetitions/day: 2993 kg

100 repetitions/day: 2755 kg

200 repetitions/day: 2470 kg

300 repetitions/day: 2328 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm

DOSAGE FIBRATEC V12-AM: 3 kg / m³

The máximum permisible static point load is 3600 kg

The Dynamic load for:

50 repetitions/day: 3150 kg

100 repetitions/day: 2900 kg

200 repetitions/day: 2600 kg

300 repetitions/day: 2450 kg

The recommended distances between the shrinkage joints are:

Indoor slab: 3,75m- 4,5m

Outdoor slab: 3,5m - 4m

Depth of cut joint: 5 cm