SLAB THICKNESS 12 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 2375 kg
The Dynamic load for:
50 repetitions/day: 2043 kg
100 repetitions/day: 1900 kg
200 repetitions/day: 1663 kg
300 repetitions/day: 1568 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 2500 kg
The Dynamic load for:
50 repetitions/day: 2150 kg
100 repetitions/day: 2000 kg
200 repetitions/day: 1750 kg
300 repetitions/day: 1650 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm