SLAB THICKNESS 13 CM
DOSAGE FIBRATEC V12-AM: 2 kg / m³
The máximum permisible static point load is 2518 kg
The Dynamic load for:
50 repetitions/day: 2328 kg
100 repetitions/day: 2138 kg
200 repetitions/day: 1948 kg
300 repetitions/day: 1805 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm
DOSAGE FIBRATEC V12-AM: 3 kg / m³
The máximum permisible static point load is 2650 kg
The Dynamic load for:
50 repetitions/day: 2450 kg
100 repetitions/day: 2250 kg
200 repetitions/day: 2050 kg
300 repetitions/day: 1900 kg
The recommended distances between the shrinkage joints are:
Indoor slab: 3m - 3,5m
Outdoor slab: 2m - 3m
Depth of cut joint: 4 cm